Jake’s TG1900 hoisting high-productivity 5 cubic yard lay-down bucket on a single part 1-5/8” load line at speeds up to 715 ft/min. in California
Notable Projects
BAE Gantry Crane
Jake’s Heavy Lift Division, in conjunction with its Custom Fabrication Division, supplied a customized TG1900 Gantry for BAE’s shipyard operations in San Diego
Jake’s TG 1900’s constructing the annex and 7-story underground parking garage for the 'Church of Jesus Christ of Latter-day Saints ' in Salt Lake City, Utah, 2000